OneSolar CRM

Tutorial

Running Site Inspections and Logging Status

Schedule a Site Visit From the Deal

Why it matters: Scheduling from the deal itself means the visit is already linked - no separate calendar entry to reconcile later.

  • Open the Deal and click Schedule Site Visit
  • Choose a date, time, and assigned technician
  • The deal automatically moves to the Site Visit Scheduled stage

Result: the deal shows a scheduled inspection date and assigned technician.

Open the Inspection Form on Mobile

Why it matters: Technicians fill this out on-site, on their phone - not from memory back at the office at the end of the day.

  • Open the OneSolar CRM mobile app and go to Today’s Visits
  • Tap the scheduled deal to open its Inspection Form

Result: the Inspection Form opens pre-filled with the client’s address and deal reference.

Log Roof Condition & Shading Analysis

Why it matters: These two fields are what actually determine system feasibility - getting them right on-site avoids a costly redesign later.

  • Select roof condition: Good, Fair, or Needs Repair
  • Log shading analysis by time of day, or attach a shading tool reading
  • Note roof orientation and pitch

Result: roof condition and shading fields are filled with specific, on-site observations.

Capture Site Photos

Why it matters: Photos give your design and sales team context no written note fully captures, and protect against disputes later about site condition.

  • Tap Add Photo and capture the roof from at least two angles
  • Photograph the electrical panel and meter location
  • Photos attach automatically to the deal’s Files tab, tagged Site Photo

Result: at least three site photos appear on the deal’s Files tab.

Record Electrical Panel Capacity

Why it matters: Panel capacity determines whether a service upgrade is needed - missing this detail is one of the most common causes of a mid-project surprise.

  • Log the panel’s amperage rating
  • Note whether a service upgrade appears necessary
  • Flag any visible code violations for the design team to review

Result: panel capacity and upgrade recommendation are recorded on the inspection form.

Mark Inspection Complete

Why it matters: This is the trigger that moves the deal forward - an inspection sitting in draft doesn’t advance the sale.

  • Review all fields for completeness
  • Tap Submit Inspection
  • The deal automatically advances to the Inspection Completed stage

Result: the deal stage updates to Inspection Completed, timestamped.

Trigger the Proposal Stage

Why it matters: This is the handoff moment most likely to stall a deal if it’s manual - automating it protects your fastest-to-close window.

  • Confirm the assigned sales rep receives a notification that inspection is complete
  • Open the Proposal tab and click New Proposal → From Inspection to begin same-day

Result: a proposal draft exists, pre-filled with this inspection’s findings.

You’ve completed this tutorial

Inspection logged. Next: turn these findings into a client-ready proposal.

Continue learning

Keep going with the next tutorials in the Solar CRM series.

See it with your own projects

Book a demo and we will walk through your workflow.

Book a demo